Skip to content. | Skip to navigation

Return to the map
Brownfield Brownfield

Tecnocity area

Via XX Settembre, 30 e 34 - 20025 - Legnano (MI)

  • Property
    Private
  • Total GFA
    1.344 m²
  • Reference sector
    Industrial
Property Private
Total GFA 1.344 m²
Buildable area 24.425 m²
Details on size of the area and the buildings AB3: industrial. floor 612 m2 , h. 6 mt . - 1° tower : Wkshp and off. floor 281 m2 , h. 2.70 mt . - 4° tower: Wkshp and off. floor 161 m2 , h. 2.70 mt . - Unit 15: Wkshp and off. floor 290 m2 , h. 2.70 mt .
Reference sector Industrial
Urban planning constraints No constraints
Digital infrastructure Tecnocity is totally cabled. The last stretch must be activated by parties renting the spaces . In Tecnocity there is a server farm.
No. of structures present 4
Year of construction Tower A3: construction date: 1950, redevelopment date 2002 Warehouse AB1: Construction date: 2002 15 units: construction date 1996; further building construction date: 1994
Preservation or maintenance status To be redeveloped
Brief description The industrial spaces offered are ideal for activating Start-ups and innovative Start-ups, ideal for the creation of a FabLab to support design and prototyping in service of the manufacturing 4.0 businesses
Energy performance Class for property energy use: B
Features and equipment The 4 properties in the Expressions of Interest are in the Tecnocity area, so they are equipped like the other spaces with the facilities made available to Tecnocity: Parking, storage and mail, canteen service, maintenance, heating and cooling for common areas
Type of operation Redevelopment
Investment type Location
Rental price range (€/m²) 100,00 - 120,00
Key opportunities
Strategic location
Strategic location; Near to the main infrastructure networks
Accessibility to infrastructure and services
Opportunity located within Tecnocity
Competitive economic context
Presence in the area of qualified services to support businesses and workers
Sectors favoured for an investment The sectors intended for investment are productive activities, energy sector, ICT, applied research, innovative services to businesses, FabLabs and Digital Academies. The idea of the municipal administration, through the target agency Euroimmobiliare and in agreement with Eurolavoro (which has the farmhouse and two levels of the tower on loan for use) is the development of a training and business services centre
Investments not permitted Excluded designations of use Gf 1 Residential, Gf 5 Retail trade, except for neighbourhood activities (Gf 5.1)
toll station
A8 - Uscita autostradale Legnano- oltre il casello Barriera Milano NORD
2 km

Strada Provinciale 12
< 1 km

railway station
Stazione di Legnano - Linee Domodossola-Milano, Luino-Milano e Porto Ceresio-Milano. Gestione RFI
< 1 km

airport
Aeroporto Internazionale Malpensa (MI)
20 km

altro
20 km - EXPO area