Skip to content. | Skip to navigation

Return to the map
Greenfield Greenfield

Peli

Via Cadimarco - 46041 - Asola (MN)

  • Property
    Private
  • Total GIA
    10.670 m²
  • Reference sector
    Industrial
Property Private
Total GIA 10.670 m²
Total GFA 10.670 m²
Buildable area 10.670 m²
Details on size of the area and the buildings PART OF MANUFACTURING TRANSFORMATION : this is part of transformation for new artisan, commercial and small industry activities. The residence of the owner of a company or the custodial personnel within the limit of a residence of 150 m2 max floor space up to 1,000 m2 of manufacturing surfaces and two residences of 150 m2 of floor space for larger manufacturing surfaces
Reference sector Industrial
Urban planning constraints No obligations
Remediation Not necessary
Digital infrastructure Access to broadband in the nearby industrial area
Investment type Sales
Sales price range (€/m²) 25,00 - 31,00
Key opportunities
Strategic location
Area located within the Mantua North manufacturing system
Accessibility to infrastructure and services
Urbanised area
Accessibility to infrastructure and services
Near to main infrastructure networks
Sectors favoured for an investment industrial
Investments not permitted Development for unhealthful industries
toll station
A4 - Desenzano del Garda (BS)
30 km

Strada extraurbana SP2
< 1 km

railway station
Stazione Ferroviaria di Asola (MN)
1 km

airport
Aeroporto di Montichiari (BS)
32 km

altro
48 km - highway toll booth for Mantua (South or North)
Semplification commitments
  • Guarantees that the Action Plan presented by the company is adopted by the City Council in less than 90 days from the date the request was registered.
  • Releases, upon a complete request being made, a Planning Permission in less than 60 days from the request.
  • Ensures an online 'front office' service or a dedicated section in the municipality's portal where investors or potential investors can find all useful information.
  • Uses and implements the 'electronic desk'.
  • Simplifies payments by creating a single contact for the payment of all expenses owed to the municipality and other entities.
  • Uses the SUAP [single contact point for productive activity] for proper additions to the Electronic Company File.
  • Guarantees a training course for the SUAP operators.
  • Participates in training programs related to the Electronic Company File.
Economic and fiscal incentives
  • Declares in advance all the urban planning and construction expenses, making sure not to introduce additional expenses.
  • Provides for an IMU [municipal property tax] + TASI [municipal tax on community services] tax rate of 9.7‰ in the areas identified.
  • Reduces the TARI [waste disposal tax] by 20% from the current amount for operating areas and occupied properties because of the reimbursement contribution.
  • Provides reimbursement of IMU and TASI debits and credits.
  • Reduces the primary and secondary land development expenses for the identified areas, as follow: Standard parameter of the Municipality: PRIMARY URBANIZATION: 7,00 SECONDARY 4,80 STANDARD:
  • CONSTRUCTION COST:
  • Improvement parameter for the identified areas: PRIMARY URBANIZATION : 5.6 SECONDARY: 3.84 STANDARD:
  • CONSTRUCTION COST:
Promotional activities and assistance to investors
  • Provides preliminary consulting services and support to companies in the presentation and implementation of their projects, with the issuance of written opinions if requested in the proposal.
  • Holds regular meetings to solve any problems with the investment process and to provide support regarding methods for payment of local taxes.
  • Enables forms of collaboration with the credit institutions in the region.